|
RICHLAND HIGH SCHOOL DD/A provided full A/E services for a replacement high school on the existing campus. The 51,445 SF, two-story facility was designed to serve the needs of 600 students in grades 9 thru 12. Features of the new high school include two-story entry lobby, three chemistry labs, food lab, art classroom/studio, choral room, and large classrooms each equipped with internet capabilities. Construction costs for the project will total $4.65 million. |
|||||||||||||